24X7 Bulk Surface Water Supply  Scheme for Jalandhar City

Project Components :

Intake of  water from Bist Doab Canal, Construction of WTP 275 MLD, laying of gravty & Rising main (2000 mm dia) & DI & MS pipes ( 250mm-1200mm dia), Construction of 5 UGSR (Storage Capacity 42 million Litre) to feed the OHSR, rezoning to be done  utilizing the existing assets  and allied works

Project Cost (Cr.):

808 Cr

Project Time Period:

48 Months

Mode of Implementation:

Tender

Executing Agency:

PWSSB

Present Status:

Under Process

Benefits of project:

24×7 Supply: Assured continuous potable water to citizens

Groundwater Conservation: Reduces extraction, improves water table

Improved Quality: Advanced filtration ensures safe drinking water

Reliable Service: Consistent pressure and supply across city

Sustainable Source: Shift from groundwater to surface water usage