Project Components :
Intake of water from Bist Doab Canal, Construction of WTP 275 MLD, laying of gravty & Rising main (2000 mm dia) & DI & MS pipes ( 250mm-1200mm dia), Construction of 5 UGSR (Storage Capacity 42 million Litre) to feed the OHSR, rezoning to be done utilizing the existing assets and allied works
Project Cost (Cr.):
808 Cr
Project Time Period:
48 Months
Mode of Implementation:
Tender
Executing Agency:
PWSSB
Present Status:
Under Process
Benefits of project:
•24×7 Supply: Assured continuous potable water to citizens
•Groundwater Conservation: Reduces extraction, improves water table
•Improved Quality: Advanced filtration ensures safe drinking water
•Reliable Service: Consistent pressure and supply across city
•Sustainable Source: Shift from groundwater to surface water usage